

Hydraulic breaker SIMAQ DB 200DX
Breaks concrete and rock, machine-mounted.
View detailsSolution by job
A hydraulic breaker is chosen by the machine that carries it: weight, oil flow and pressure have to match. SIMAQ has three: the DB 40V for skid steers (325 kg, 35–70 L/min), the DB 60V for backhoes (412 kg, 40–110 L/min) and the DB 200DX for 20 t excavators (1,577 kg, 120–170 L/min).
Also called: hydraulic breaker, hydraulic hammer, rock breaker
Field rules
Field rule: the breaker is matched to the carrier class (skid steer, backhoe or excavator) and its hydraulics; confirm it with your advisor before mounting.
Strike 15–30 seconds per spot, then reposition. Hammering a spot that won't break overheats the piston.
Never pry with the breaker: the boom pays the bill. It breaks by impact, not leverage.
Chisel at 90° with the machine's weight on it before striking. Striking into thin air (dry-firing) is the fastest way to wreck a breaker.
The machines for this job
Does the job call for the full package?
Send all 3 machines to the quote builder at once — adjust quantities and drop what you don't need.
Before you buy, learn
Get a quote without leaving
Want to work it out with an advisor?
Job: Break with a hydraulic hammer
FAQ
Skid steer → DB 40V. Backhoe → DB 60V. Excavator of about 20 t → DB 200DX. Before you buy, check that your machine's flow and pressure fall in the breaker's range; the advisor confirms it with your machine's model.
It depends on the model: the DB 40V takes 35–70 L/min, the DB 60V 40–110 L/min and the DB 200DX 120–170 L/min. If your machine delivers less, the breaker hits weak; if it delivers far more, you punish it.
It's striking without the chisel pressed against the material. All the energy comes back into the breaker and the boom. Set the chisel at 90°, put the machine's weight on it, then strike.
15 to 30 seconds. If it doesn't break, move the chisel to another spot: persisting overheats the tip. Start at a free edge, not the center.
Grease the chisel bushing often, with the breaker vertical. Check hoses and couplings for leaks before every shift.
Tell us about the job and we'll build the package. Same-day reply.