Scaffold handling

To build a safe scaffold, set it on firm ground and level it with screw jacks, fit both cross-braces on each frame before going up a level, cover the full width with planks and, if it's mobile, keep the casters locked while working. Each SIMAQ scaffold frame (A001) takes its two cross-braces (A002); the A003 screw jack levels it and the A004 plank measures 25 cm × 3.00 m.

A badly built scaffold is the #1 cause of falls. The basics to get the crew up safely.

Safe assembly · step by step

0/5

Costly mistakes

  • Leveling with stones or wedges instead of jacks.
  • Going up a level without the lower cross-braces.
  • Moving the scaffold with people or material on board.
  • Overloading the deck beyond its limit.

What a scaffold section is made of

A section is two frames and two cross-braces. Screw jacks go underneath to level it (or locking casters if it moves) and planks on top.

What a scaffold section takes and how many you needDrawing of one scaffold section: two frames, one front and one back, joined by two cross-braces, one on each side. On top, 25 centimeter by 3.00 meter platforms covering the full width. Below, each leg sits on a leveling jack, or on a braked caster if the scaffold rolls. To count: sections equal bays along the length times levels in height. Example: 4 bays by 3 levels is 12 sections, and since each section takes 2 cross-braces, that's 24 cross-braces.12341Frame × 22Cross-brace × 2 (one per side)3Platforms 25 cm × 3.00 mcovering the full width4Leveling jackor caster with brakesections = bays along× levels upExample4 bays3 levels4 × 3 =12 sections12 sections × 2 = 24 cross-braces
Not to scale. Count bays along by levels up; each section takes its 2 cross-braces.

To work out your façade: How many scaffold sections do I need? · If you'll move it: locking scaffold caster (A005)

Practice

Build the scaffold yourself

Level by level, with SIMAQ parts and with the shortcuts that tempt you on site. When you go up to work, whatever would bring the scaffold down shows in red.

…

Work out the frame sets, braces and jacks for your façade →

FAQ

What people ask most

How do you assemble a scaffold step by step?

Set it on firm ground and level it with screw jacks, fit both cross-braces on each frame before going up a level, and cover the full width with gap-free planks. Climb the internal ladder, with guardrails at height, and if it's mobile keep the casters locked while working.

What parts make up a scaffold section?

A section is two frames (A001) and two cross-braces (A002). It's completed with screw jacks (A003) for leveling, 25 cm × 3.00 m planks (A004) and, if it will be moved, locking casters (A005).

How many scaffold sections do I need?

Multiply the bays along the length by the levels of height: sections = bays × levels. Your sales advisor confirms each frame's height in the quote.

Can I level a scaffold with stones or wedges?

No: level it with screw jacks. Stones, blocks or wedges shift under load and the scaffold leans.

Can you move a scaffold with people on it?

Never. Get people and material down, release the brakes, move it, and lock the casters again before anyone climbs back up.

Get a quote without leaving

Want to work it out with an advisor?

Topic: Scaffolding

Get advice and a quote

Leave your name and phone: a specialist in your country will text or call you.

Your country*
A specialist contacts you during business hours (Mon–Fri 8:00–17:00 / Sat 8:00–12:00).

Ready for a quote?

Tell us about the job and we'll build the package. A rep replies during business hours.

WhatsAppGet a quote