

Power trowel SQ36 PRO
Mirror slab finish, on schedule.
View details
Even mix, pour after pour.
EngineHonda GX390 · 13 HP
SIMAQ advantages

SIMAQ on the job
Even mix, pour after pour.
In action
5-minute training
5 minThe mixer blends evenly and on time; proportion and load order decide the strength of your pour. When a batch comes out wrong it's rarely the machine: it's extra water, load order or mixing time.
Get your operator certified for free (Spanish)Set the mixer on firm, level ground with the brake or chocks on. Grease the marked points and check the engine oil.
With the drum turning, add part of the water first so material won't cake on the bottom.
Add gravel, then cement, then sand and the rest of the water. Keep your proportion for the application and don't exceed the drum's capacity (1.5 or 2 sacks).
Let it turn to uniform color and texture. If you see lumps, give it a bit longer; leave it too long and the mix dries out and segregates.
Dump it fully, not halfway. If you'll stop for a while, throw water and gravel into the turning drum to scour it before anything sets.
Do this
Avoid this
Safety
Calculate before you quote
What jobs this machine is built for.
The same machine, told for your business: pick your industry and see the full case.
Batch-pour pace: 2 bags per cycle so the pouring crew never waits on mix.
All the gear for this industryMunicipalities & public worksSidewalks, curbs and gutters by direct administration: mix on the spot, no ready-mix truck dependency.
All the gear for this industryPrecast concrete producersThe heart of batch production: 2 bags per cycle, repeatable dosing — piece 400 comes out like piece 4.
All the gear for this industryBuying guides
Drum, blades, ring gear, pinion, pulleys and belts, motor, handwheel and brake, chassis and wheels: what each part of a concrete mixer does, which ones wear first and how to order a spare without knowing the code.
Read Guide · 6 minWhen a wheelbarrow is enough, when a 4×4 dumper like the Urban 1500 multiplies progress and when you need a skid steer. Simple criteria and common mistakes.
Read Guide · 7 minWhich concrete mixer fits what you pour each day: 1.5 or 2 bags, electric or gas. Simple maths, common mistakes and the SIMAQ model for each case.
ReadBy sacks per batch: 1.5 sacks for small crews and remodels; 2 sacks for continuous work. Available in gasoline and electric.
Gasoline for off-grid or high-mobility work; electric for interiors and fine vibration. Quick hose coupling for the element you're pouring.
Walk-behind (SQ36) for medium slabs and edges; ride-on (twin) for large surfaces and output. Both deliver a mirror finish.
6-month warranty, parts and local after-sales. Quote via form or WhatsApp, reply during business hours.
Tell us about the job and we'll build the package. A rep replies during business hours.
Concrete mixer SQREVG550LTS · SQREVG550LTS
No reviews for this equipment yet. If you use it, tell others how it's going.