Skip to content
SIMAQ
Ride-on double power trowel SQ36DOUBLE PRO
SIMAQ PROPremium line
SQ36DOUBLE PRO

Ride-on double power trowel SQ36DOUBLE PRO

Mirror slab finish, on schedule.

EngineHonda GX690

Get a quote for this machine today

Leave your name and phone: a specialist in your country will text or call you.

Your country*
A specialist contacts you during business hours (Mon–Fri 8:00–17:00 / Sat 8:00–12:00).

Features

  • Steel blades
  • Operator-presence seat sensor

Specifications

Power
13 kW (20 HP)
Engine
Gasolina, enfriado por aire, dos cilindros, cuatro tiempos
Blade size
360 × 195 mm (8 en total)
Ride-on double power trowel SQ36DOUBLE PRO — on the job

SIMAQ on the job

Proven on the real jobsite

Mirror slab finish, on schedule.

Anatomy of the machine

Premium parts of the machine

Hover the dots —or tap them— to explore each component and why it matters.

Ride-on double power trowel SQ36DOUBLE PRO
Auto tour

5-minute training

5 min

How to use the power trowel

The power trowel gives the slab its smooth or mirror finish. It's all about timing: get on when the concrete is just right, not before, not after. If the slab sets unevenly (sun on one side, shade on the other), start where it's furthest along.

  1. 01

    Wait for the set

    The slab should hold your footprint at ~3–5 mm. If you sink deeper, wait; if it barely marks, get on now with the pan.

  2. 02

    Float pan first

    Fit the float pan for the first floating: it closes the surface and levels without marking. Even, overlapping sweeps.

  3. 03

    Switch to blades to finish

    Remove the pan and fit the blades. Raise the pitch a little each pass to keep closing and bringing up the shine; raise it all at once and the blades gouge.

  4. 04

    Cross your passes

    Run one direction, then perpendicular. Crossing erases waves and leaves it truly flat.

  5. 05

    Edges by hand

    Where the machine can't reach —edges and corners— finish by hand trowel so it matches.

Do this

  • Keep a steady pace; control is in your wrists.
  • Adjust blade pitch gradually, pass by pass.
  • If one area sets before the rest → start there.
  • Keep spare blades ready: they wear out.

Avoid this

  • Don't get on too early: you sink it and ruin the level.
  • Don't wait too long: hard concrete won't take a finish.
  • Don't throw water on the slab to 'revive' it: it weakens the surface.
  • Don't leave it spinning in place on the slab.

Safety

  • Rubber boots, knee pads for edges and gloves.
  • Firm grip on the handle: the spin torque pulls the machine.
  • Switch off before lifting or moving the trowel.

Applications

What jobs this machine is built for.

  • Slabs and floor decks
  • Columns and walls (vibration)
  • Floor finishing (troweling)
  • On-site concrete mixing
  • Concrete paving

Frequently asked

What mixer capacity do I need?

By sacks per batch: 1.5 sacks for small crews and remodels; 2 sacks for continuous work. Available in gasoline and electric.

Gasoline or electric vibrator?

Gasoline for off-grid or high-mobility work; electric for interiors and fine vibration. Quick hose coupling for the element you're pouring.

Walk-behind or ride-on trowel?

Walk-behind (SQ36) for medium slabs and edges; ride-on (twin) for large surfaces and output. Both deliver a mirror finish.

Warranty, parts and quote?

6-month warranty, parts in stock and local after-sales. Quote via form or WhatsApp, same-day reply.

Ready for a quote?

Tell us about the job and we'll build the package. Same-day reply.

Ride-on double power trowel SQ36DOUBLE PRO · SQ36DOUBLE PRO

Customer reviews

No reviews for this equipment yet. If you use it, tell others how it's going.