Guide · 4 min

5 maintenance routines that extend your machine's life

Most light-equipment failures aren't from the factory: they're from maintenance that didn't happen. These five routines take minutes and prevent jobsite downtime.

5

simple routines

horas

not the calendar

3

key moments

Before starting: levels and leaks

  • Check oil, fuel and coolant.
  • Look for leaks and loose or cracked hoses.
  • Clean or check the air filter — jobsite dust clogs it fast.

After the shift: cleaning and bolts

  • Clean the machine: concrete and dust speed up wear.
  • Check bolts and screws — vibration loosens them.

Periodic: oil, ignition and storage

Change the oil by hours of use, not just the calendar. Check spark plugs or injectors. And store the machine dry and covered: the weather rusts and ruins components that never failed on the job.

Takeaway

A pre-start check, cleaning and bolts at the end, and periodic maintenance by the hour. Parts and after-sales at every distributor (ConstruMarket — CMARKET in Guatemala).