

Power trowel SQ36 PRO
Mirror slab finish, on schedule.
View details
Premium lineDrives out air for dense, void-free pours.
EngineHONDA GX160
SIMAQ advantages

SIMAQ on the job
Drives out air for dense, void-free pours.
Anatomy of the machine
Hover the dots —or tap them— to explore each component and why it matters.
5-minute training
5 minThe immersion vibrator drives trapped air out of fresh concrete so it ends up dense, with no honeycombing. Under-vibrate and you leave voids; over-vibrate and the aggregate sinks while the paste rises.
Get your operator certified for free (Spanish)No power or a big site → gasoline (SQ28 PRO) or backpack (SQMG28); indoors or noise limits → electric (SQVEH40 or the mini vibrator). Small head for thin or heavily reinforced elements; 38 mm for slabs, beams and footings.
Place concrete in even lifts and vibrate each one before the next. Fill a tall wall or column in one go and the air at the bottom can't get out.
Drop the head in vertically and fast, going a little into the lift below while it's still fresh: that knits both lifts into one piece.
Vibrate until a thin layer of paste rises and large bubbles stop. Longer doesn't help: it segregates the aggregate.
Pull the head out slowly so the hole closes itself. Yank it and you leave an air channel inside.
Repeat on an even grid, spacing points ~1.5× the action radius so the circles overlap. If no paste shows between two points, move them closer.
Do this
Avoid this
Safety
What jobs this machine is built for.
The same machine, told for your business: pick your industry and see the full case.
Buying guides
When to start curing, for how many days, with water, burlap, plastic or curing compound, and the mistakes that rob your slab or column of strength.
Read Guide · 7 minEvery concrete vibrator has a motor, a coupling, a hose with a flexible shaft inside and a head that does the vibrating. What each part does, which ones wear and how to look after them so it doesn't lose power.
Read Guide · 6 minHoneycombs are trapped air and poorly consolidated mix. Why they appear, the vibrating technique that prevents them (vertical, 5–15 s, overlapping points) and which SIMAQ vibrator fits each element.
ReadBy sacks per batch: 1.5 sacks for small crews and remodels; 2 sacks for continuous work. Available in gasoline and electric.
Gasoline for off-grid or high-mobility work; electric for interiors and fine vibration. Quick hose coupling for the element you're pouring.
Walk-behind (SQ36) for medium slabs and edges; ride-on (twin) for large surfaces and output. Both deliver a mirror finish.
6-month warranty, parts in stock and local after-sales. Quote via form or WhatsApp, same-day reply.
Tell us about the job and we'll build the package. Same-day reply.
Concrete vibrator SQ28 PRO · SQ28 PRO
No reviews for this equipment yet. If you use it, tell others how it's going.