

Power trowel SQ36 PRO
Mirror slab finish, on schedule.
View details
Levels and vibrates the slab in one pass.
EngineHonda GX35
SIMAQ advantages

SIMAQ on the job
Levels and vibrates the slab in one pass.
In action
Anatomy of the machine
Hover the dots —or tap them— to explore each component and why it matters.
5-minute training
5 minThe vibrating screed works the surface: it levels the slab and compacts its top. If the slab is thicker than the spec sheet allows (200 mm on the SQRVA6M PRO) or heavily reinforced, vibrate first with an immersion vibrator and then run the screed.
Set your screed rails or level references. The blade works against them; without a reference, the screed just copies the lows of the pour.
SQRVA1.2SET: 1.2 m blade for corridors, edges and tight areas; 3 m for wider slabs. For big spans, the SQRVA6M PRO builds up to 6 m from 1, 2 and 3 m sections.
With the concrete spread, start the vibration and pull at a steady speed. Go too fast and lows are left uncompacted; stop and the vibration sinks the aggregate and marks the slab.
Keep a small roll of mix ahead of the blade so it fills the lows as you advance.
If lows remain, fill with a shovel and re-screed. Then floating and troweling take over, once the slab holds a 3–5 mm footprint.
Do this
Avoid this
Safety
What jobs this machine is built for.
The same machine, told for your business: pick your industry and see the full case.
The new sidewalk's finish: a 1.2 m vibrating screed for sidewalk panels and ramps.
All the gear for this industryPrecast concrete producersPavers and slabs with a sales face: a 1.2 m vibrating screed for the flat finish the customer inspects.
All the gear for this industryBuying guides
The exact moment to go in with the power trowel (the footprint test), pan first and blades after, and when a walk-behind or a ride-on double makes sense.
Read Guide · 7 minThey don't compete: one removes air from inside, the other levels the surface. When to use each, when to use both, and which SIMAQ model fits each case.
ReadBy sacks per batch: 1.5 sacks for small crews and remodels; 2 sacks for continuous work. Available in gasoline and electric.
Gasoline for off-grid or high-mobility work; electric for interiors and fine vibration. Quick hose coupling for the element you're pouring.
Walk-behind (SQ36) for medium slabs and edges; ride-on (twin) for large surfaces and output. Both deliver a mirror finish.
6-month warranty, parts and local after-sales. Quote via form or WhatsApp, reply during business hours.
Tell us about the job and we'll build the package. A rep replies during business hours.
1.2 m vibrating screed SQRVA1.2SET · SQRVA1.2SET
No reviews for this equipment yet. If you use it, tell others how it's going.