Skip to content
SIMAQ
1.2 m vibrating screed SQRVA1.2SET
SQRVA1.2SET

1.2 m vibrating screed SQRVA1.2SET

Levels and vibrates the slab in one pass.

EngineHonda GX35

Get a quote for this machine

Leave your name and phone: a specialist in your country will text or call you.

Your country*
A specialist contacts you during business hours (Mon–Fri 8:00–17:00 / Sat 8:00–12:00).

SIMAQ advantages

  • Includes two blades: 1.2 m and 3 m
  • Pro-Club maintenance kit included

Features

  • Rigid profile
  • Lightweight

Specifications

Power
1.5 HP
Blades included
1.2 y 3.0 m
1.2 m vibrating screed SQRVA1.2SET — on the job

SIMAQ on the job

Proven on the real jobsite

Levels and vibrates the slab in one pass.

In action

Watch this machine at work

More SIMAQ videos
  • Vibrating screed

Anatomy of the machine

Premium parts of the machine

Hover the dots —or tap them— to explore each component and why it matters.

1.2 m vibrating screed SQRVA1.2SET
Auto tour

5-minute training

5 min

How to use the vibrating screed

The vibrating screed works the surface: it levels the slab and compacts its top. If the slab is thicker than the spec sheet allows (200 mm on the SQRVA6M PRO) or heavily reinforced, vibrate first with an immersion vibrator and then run the screed.

  1. 01

    Set the level

    Set your screed rails or level references. The blade works against them; without a reference, the screed just copies the lows of the pour.

  2. 02

    Pick the blade

    SQRVA1.2SET: 1.2 m blade for corridors, edges and tight areas; 3 m for wider slabs. For big spans, the SQRVA6M PRO builds up to 6 m from 1, 2 and 3 m sections.

  3. 03

    Start vibration and pull evenly

    With the concrete spread, start the vibration and pull at a steady speed. Go too fast and lows are left uncompacted; stop and the vibration sinks the aggregate and marks the slab.

  4. 04

    Keep a roll of concrete ahead

    Keep a small roll of mix ahead of the blade so it fills the lows as you advance.

  5. 05

    Second pass if needed

    If lows remain, fill with a shovel and re-screed. Then floating and troweling take over, once the slab holds a 3–5 mm footprint.

Do this

  • Pull at a steady speed; on the SQRVA6M PRO, 1.2 to 2.5 m per minute.
  • If lows remain → fill with a shovel and re-screed, don't cover them with slurry.
  • Clean the blade between pours.
  • Coordinate with the crew feeding concrete.

Avoid this

  • Don't over-vibrate one spot: you sink the aggregate.
  • Don't run it without a level reference and expect flat.
  • Don't add water to the mix so the screed 'runs': it weakens the surface.
  • Don't leave it running, resting on concrete, without moving.

Safety

  • Rubber boots, gloves and glasses.
  • Straight-back posture when pulling; use your legs.
  • Switch off vibration before lifting it.

Applications

What jobs this machine is built for.

  • Slabs and floor decks
  • Columns and walls (vibration)
  • Floor finishing (troweling)
  • On-site concrete mixing
  • Concrete paving

Frequently asked

What mixer capacity do I need?

By sacks per batch: 1.5 sacks for small crews and remodels; 2 sacks for continuous work. Available in gasoline and electric.

Gasoline or electric vibrator?

Gasoline for off-grid or high-mobility work; electric for interiors and fine vibration. Quick hose coupling for the element you're pouring.

Walk-behind or ride-on trowel?

Walk-behind (SQ36) for medium slabs and edges; ride-on (twin) for large surfaces and output. Both deliver a mirror finish.

Warranty, parts and quote?

6-month warranty, parts and local after-sales. Quote via form or WhatsApp, reply during business hours.

Ready for a quote?

Tell us about the job and we'll build the package. A rep replies during business hours.

1.2 m vibrating screed SQRVA1.2SET · SQRVA1.2SET

Customer reviews

No reviews for this equipment yet. If you use it, tell others how it's going.