Skip to content
SIMAQ
1.2 m vibrating screed SQRVA1.2SET
SQRVA1.2SET

1.2 m vibrating screed SQRVA1.2SET

Levels and vibrates the slab in one pass.

EngineHonda GX35

SIMAQ advantages

  • Includes two blades: 1.2 m and 3 m
  • Pro-Club maintenance kit included

Features

  • Rigid profile
  • Lightweight

Specifications

Power
1.5 HP
Blades included
1.2 y 3.0 m
1.2 m vibrating screed SQRVA1.2SET — on the job

SIMAQ on the job

Proven on the real jobsite

Levels and vibrates the slab in one pass.

In action

Watch this machine at work

More SIMAQ videos
  • Vibrating screed

Anatomy of the machine

Premium parts of the machine

Hover the dots —or tap them— to explore each component and why it matters.

1.2 m vibrating screed SQRVA1.2SET
Auto tour

5-minute training

5 min

How to use the vibrating screed

The vibrating screed levels and compacts the pour's surface in one pass, leaving it ready for floating.

Training video

Coming soon

In the meantime, follow the step-by-step guide.

  1. 01

    Set the level

    Set your screed rails or level references. The screed blade works against them.

  2. 02

    Pick the blade

    Short blade (1.2 m) for tight areas and edges; long (3 m) for wide slabs.

  3. 03

    Start vibration and pull evenly

    On fresh concrete, pull the screed at a steady speed. Vibration settles it and the blade levels it.

  4. 04

    Keep a roll of concrete ahead

    Keep a small roll of mix ahead of the blade so it fills the lows as you advance.

  5. 05

    Second pass if needed

    If lows remain, fill by hand and re-screed. Then floating/troweling takes over.

Do this

  • Steady pull speed: no jerking, no stalling.
  • Clean the blade between pours.
  • Coordinate with the crew feeding concrete.

Avoid this

  • Don't over-vibrate one spot: you sink the aggregate.
  • Don't run it without a level reference and expect flat.
  • Don't leave it running, resting on concrete, without moving.

Safety

  • Rubber boots, gloves and glasses.
  • Straight-back posture when pulling; use your legs.
  • Switch off vibration before lifting it.

Applications

What jobs this machine is built for.

  • Slabs and floor decks
  • Columns and walls (vibration)
  • Floor finishing (troweling)
  • On-site concrete mixing
  • Concrete paving

Frequently asked

What mixer capacity do I need?

By sacks per batch: 1.5 sacks for small crews and remodels; 2 sacks for continuous work. Available in gasoline and electric.

Gasoline or electric vibrator?

Gasoline for off-grid or high-mobility work; electric for interiors and fine vibration. Quick hose coupling for the element you're pouring.

Walk-behind or ride-on trowel?

Walk-behind (SQ36) for medium slabs and edges; ride-on (twin) for large surfaces and output. Both deliver a mirror finish.

Warranty, parts and quote?

6-month warranty, parts in stock and local after-sales. Quote via form or WhatsApp, same-day reply.

Ready for a quote?

Tell us about the job and we'll build the package. Same-day reply.

WhatsAppGet a quote